Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 13 results ...

Amirkhanian, S N and Baker, N J (1992) Expert System for Equipment Selection for Earth‐Moving Operations. Journal of Construction Engineering and Management, 118(02), 318–31.

Bernold, L E and Chang, P (1992) Potential Gains through Welded‐Wire Fabric Reinforcement. Journal of Construction Engineering and Management, 118(02), 244–57.

Diekmann, J E and Kim, M P (1992) SuperChange: Expert System for Analysis of Changes Claims. Journal of Construction Engineering and Management, 118(02), 399–411.

Dilger, W H, Tadros, G S and Giannelia, P (1992) Method Proposed for Construction of Multispan Cable‐Stayed Bridges. Journal of Construction Engineering and Management, 118(02), 273–82.

Federle, M O and Maloney, W F (1992) Substitutes for Leadership and Unionized Construction Carpenters. Journal of Construction Engineering and Management, 118(02), 332–48.

Hulme, T W and Burchell, A J (1992) Bored Tunneling for Singapore Metro. Journal of Construction Engineering and Management, 118(02), 363–84.

Kangari, R, Farid, F and Elgharib, H M (1992) Financial Performance Analysis for Construction Industry. Journal of Construction Engineering and Management, 118(02), 349–61.

Nam, C H and Tatum, C B (1992) Noncontractual Methods of Integration on Construction Projects. Journal of Construction Engineering and Management, 118(02), 385–98.

Nicholls, R (1992) Construction of Grout‐Impregnated Fabric‐Reinforced Pipes. Journal of Construction Engineering and Management, 118(02), 283–302.

Paek, J H, Lee, Y W and Napier, T R (1992) Selection of Design/Build Proposal Using Fuzzy‐Logic System. Journal of Construction Engineering and Management, 118(02), 303–17.

  • Type: Journal Article
  • Keywords: Decision making; Bids; Construction costs; Technology; Selection; Uncertainty principles; Fuzzy sets; Design/build;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1992)118:2(303)
  • Abstract:
    With the cost of construction to replace deteriorated facilities estimated in the billions of dollars, the Department of Defense is seeking ways of reducing both the time and money spent to provide the high‐quality structures needed to support the military mission. Design/build procurement approaches have been proposed as alternatives to the traditional design/bid/build method. The successful selection process for choosing a design/build proposal is based on a high degree of technical factors and a low construction cost. However, the objectives of maximizing the degree of technical factors and minimizing the cost are in conflict, and the evaluation of the technical factors and cost is associated with the uncertainty. In this study, a multicriterion decision‐making methodology using a fuzzy‐logic system is provided to assist decision makers in selecting the winning design/build proposal that best satisfies the requirement of technical factors and the cost reduction. An example application of the proposed evaluation methodology to an actual project is provided.

Tiong, R L K (1992) Strategies in Risk Management of On‐Demand Guarantees. Journal of Construction Engineering and Management, 118(02), 229–43.

Tiong, R L K, Yeo, K and McCarthy, S C (1992) Critical Success Factors in Winning BOT Contracts. Journal of Construction Engineering and Management, 118(02), 217–28.

Touran, A and Wiser, E P (1992) Monte Carlo Technique with Correlated Random Variables. Journal of Construction Engineering and Management, 118(02), 258–72.